Boq for rcc work

WebFeb 19, 2024 · 18- Waterproofing work: It is measured in SQM or m2. 19- Hacking/ Roughening: It is measured in SQM or m2. 20- Fixing GI Mesh: It is measured in RMT or m. 21- Damp Proof Course: It is measured in SQM or m2. 22- Dismantling: It is measured in CUM or m3 & Sqm. m2 Both Depend upon Item. 23- Steel Work: Steel bars in RCC … WebBOQ for Drainage work at coal handling area S.no Item Description Unit Rate Quantity Amount Drainage work (RCC Drain) 1 Earth work in excavation in all kinds of soil, lift upto 20 Mts., stacking the material temporarily near the excavated area and then filling back …

BOQ RCC Septic Tank For AFOH Offices PDF PDF - Scribd

WebJan 8, 2024 · BOQ is a term used in the construction sector and is a key document required by the contractor to understand the scope of work for a project. BOQ provides the quantities for all types of the scope of work, along with the nature of scope for each trade within … WebProviding and fixing in position water-stops with a central longitudinal hollow tube with stiff wings and longitudinal corrugations as per manufacturer's specifications for joints in RCC work including cuttings, fittings, jointings, … biofire respiratory viral panel https://elmobley.com

What is BOQ? – Purpose, Importance, Advantages, Disadvantages

http://www.constructioncivilengineering.com/data-of-bill-of-quantities.html WebItem of Work : RCC-M20 Rate Analysis for : 10.000 cu.mt Description : RCC M20 (1:1.5:3) concrete in Ordinary Works ... Estimates and Cost Abstracts can be prepared easily, by entering the BOQ quantities of the project. Program will automatically work out Material Take Off, Material Cost and Labour Cost involved in project, using the same rate ... WebFor rate analysis of RCC, we need to multiply each quantity with their rates to get the amount for every item of work. Rates vary from place to place and time to time. It is advisable to assume local rates or standard rates of the place. The sum total of all the … daikin 1.5 ton 4 star inverter ac 2022

BOQ for Proposed Structural Repairing Work At 4th Floor, C …

Category:PLAIN CEMENT CONCRETE WORK : REINFORCED …

Tags:Boq for rcc work

Boq for rcc work

Bills of Quantities for Demolitions - SANBI

WebFINISHING & CLADDING WORK : 13.1 12 mm cement plaster of mix : 13.1.2 1:6 (1 cement: 6 fine sand) 600 Sqm. 13.2 15 mm cement plaster on the rough side of single or half brick wall of mix : 13.2.2 1:6 (1 cement: 6 fine sand) 600 Sqm. 13.44 Finishing walls with water proofing cement paint of required shade : 13.44.1 New work (Two or more coats ... WebPlan and Elevation of RCC Footing. From the above footing plan and elevation, it can be seen that formwork area required will be. 2 x (2 + 3) x 0.6 = 6 m 2. Similarly, for a reinforced concrete beam, the measurement of formwork will be taken as the combined surface area of two sides and bottom of the beam.

Boq for rcc work

Did you know?

WebFINISHING & CLADDING WORK : 13.1 12 mm cement plaster of mix : 13.1.2 1:6 (1 cement: 6 fine sand) 600 Sqm. 13.2 15 mm cement plaster on the rough side of single or half brick wall of mix : 13.2.2 1:6 (1 cement: 6 fine sand) 600 Sqm. 13.44 Finishing walls …

http://www.europeanprogres.org/dokumenti/211_858653_1tboq-eng.pdf http://www.gshp2.gov.in/sites/default/files/tenders/Section%207%20BOQ%20Template%2024052013.pdf

WebRCC structural element including cleaning of the holes by air blower and Inserting 12mm dia. Teflon nozzles compatible with epoxy injector and having machined external end to receive outlet of grouting gun. Fix it inside the holes by applying thixotropic epoxy putty to ensure complete sealing and allow to cure the system for min.8 hrs before ... WebBoQ means a bill of quantity is a document prepared by a cost estimator to calculate the exact cost of project work by multiplying item work by their rate. It is the most important document for tendering and contracting. Bill of quantity gives an idea about the cost of a …

WebApr 13, 2024 · Work Description Supply, installation and commissioning of Cytocentrifuge and its accessories in Pathology Division of Regional Cancer Centre, Thiruvananthapuram, Kerala state NDA/Pre Qualification

Web(b) Necessary scaffolding to work at all levels. (c) Curing for a minimum period of fourteen (14) days (d) Work at all levels (iv) Testing of waterproofing by storing of water as directed by the employer for 7 days. In case of failure, or leakages, the contractor to carry out remedial measures as suggested by the Engineer in Charge. daikin 1.5 ton inverter acWebParticipate online through e-Procurement website for Rcc Box tenders in Sikkim. Download Tender Documents, BOQ, Technical Bids for Rcc Box related Tenders from Sikkim. Get Bidding support for etenders related to Rcc Box Tenders in Sikkim. ... on lachen kalep between km 0.570 to km 17.803 for resurf work fy 2024 24 under 86 rcc . Due Date : Jan ... biofire rp2.1 panel package insertWebShuttering of formwork is recommended to be calculated separately. If reinforcement or shuttering are included and considered as a consolidated item with RCC, this should be properly described in the item description. Its unit is cubic meters. 7. Steel Work. The quantity includes bending and binding in position and is measured in quintal. biofire rp2.1 verification kitWeb11 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level for TMT bars of Fe500 grade Kg 500 12 Laying of RCC cover slabs with 1:1.5:3 with necessary curing and placing in position. … biofire rp2.1 package insertWebBrick work with modular fly-ash lime bricks (FaLG Bricks) confirming to IS:12894-2002 of class designation 4.0 in foundation and plinth and super structure a.Cement Mortar 1:4 (1 Cement : 4 Coarse Sand) Cement concrete (Plain and RCC) Providing and laying nominal mix cement concrete with crushed stone aggregate using daikin 1.5 ton split ac price 5 starWebquantities of work ordered and carried out, as measured by the Contractor and verified by the Engineer and `valued at the rates and prices bid in the priced Bill of Quantities, where ... BOQ : (SECTION-I) Umreth – Vasad Road Km-0+000 to 19+250 (SH No-83) and Km-0+000 to 9+250 (SH No-188) Item No. DESCRIPTION . Unit . Quantity . Unit Rate ... daikin 1.5 ton split ac 3 starWebProcedure of BOQ preparation for RCC: Taking off is the procedure of studying the drawing as well as its specifications to find the parts needed for BOQ preparation. In that step, the suitable description of a specific work is specified to describe and explain the work … daikin 16kw ducted air conditioner